
Metal roof restoration · Anti-rust
Rusty metal roof? Don't re-roof yet.Restoration typically costs 40–60% of re-roofing
Our patented rust converter primer turns tightly adhered rust into a stable protective layer — no sandblasting, no stripping the roof. Only sheets that have rusted through are replaced. We work from the outside of the roof, area by area, while production continues.
- Patented rust converter — no sandblasting
- Number of coats set by rust level
- Full system tested: 300 h salt spray, 7 MPa adhesion
- If it's time to re-roof, we say so
- 40–60%
- of the cost of re-roofing
- 7 MPa
- adhesion, full system (third-party tested)
- 300 h
- neutral salt spray, no defects
- Patent
- ZL201910886793.4 rust converter
Whole factory roofs restored — not one sheet replaced
Same roof before and after, photographed by our own crews. Work done from the outside of the roof while the factories kept running.
-
Before
After
34,800 m²
Manufacturing plant · Huangshi, Hubei
Several large-span buildings · 2024
Old roofs faded with patches of rust. Fully recoated in bright blue — no sheets replaced.
-
Before
After
52,000 m²
Shiji Xingui Ceramics · Yichun, Jiangxi
Ceramics factory · 2022
Red-brown roof sheets rusted and faded. Rust converter primer, then a dark blue-grey topcoat over the whole roof.
-
Before
After
12,000 m²
Xiduan Machine Tools · Wuxi
Machine tool plant · 2020
Rust spots everywhere and some perforations. Perforations patched, rust converted, then primer and a white topcoat — rust protection and cooling in one job.
Which rust level is your roof?
One roof often has all three. We grade it area by area on site and specify each area separately.
-
Light rustRestore directly
Scattered rust spots at fasteners, folds and sheet backs; the surface is still fairly smooth.
Pressure-wash off loose rust and flaking paint, then 1–2 coats of CST880-701 2-in-1 rust primer & topcoat.
CST880-701 ×1–2
-
Medium rustSeal, then topcoat
Original paint chalked and discoloured over large areas, with joined-up rust patches; surface still basically flat.
After removing loose rust: 2 coats of RPP210 rust-tolerant primer to seal the rust, then 1–2 coats of CST880 topcoat.
RPP210 ×2 → CST880 ×1–2
-
Heavy rustConvert + protect + topcoat
Whole surface rusted; laps and sheet edges often rusted through; rough, gritty rust.
Remove loose rust, 1 coat of MAP120 rust converter, 2 coats of RPP210, then 1–2 coats of CST880. Perforated sheets are patched or replaced first.
MAP120 ×1 → RPP210 ×2 → CST880 ×1–2
If sheets are rusted through over large areas or purlins are corroded, re-roofing is better value, and we'll tell you.
Why the rust doesn't need grinding off
- 1
Tight rust is converted where it is (patented)
MAP120 reacts with the rust to form a dense, stable black protective layer. No sandblasting, no grinding to bare metal — old sheets don't get thinner (patent ZL201910886793.4).
- 2
Fasteners and laps: fabric-reinforced, three coats
Rust starts at screws, laps and gutters — the same places that leak. Each one gets a coat, a polyester fabric, then two more coats. A bead of sealant alone cracks within a year or two.
- 3
Primer to topcoat from one factory
Rust converter, rust primer and topcoat are all made in our factory and tested together: the CST880 system has 7 MPa adhesion (CTC report WT2020B01C04598).

Restoration vs re-roofing
| TEYISHU restoration | New roof sheets | |
|---|---|---|
| Cost | Typically 40–60% of re-roofing, depending on rust level and sheets replaced | Strip-out, disposal, new sheets and installation |
| Production | Work from the outside of the roof; production continues | Roof opened up; goods often moved, production stopped |
| Schedule | Area by area; just avoid rainy days | Long strip-and-fit programme; risky in the rainy season |
| Leaks | Rust, leaks and topcoat in one job | New sheets still need screws and laps sealed |
The price depends on rust level, the number of leak points (screws, laps, gutters, skylights), where the work is (roof, walls or steelwork) and the area and height.
Third-party test data: full anti-rust system (primer + topcoat)
Anyone can write "acid and salt-spray resistant". Ask for the report number, check that the whole system was tested, and look for hours and results.
| Test | Standard requirement | TEYISHU result |
|---|---|---|
| Neutral salt spray | 300 h: no rust, blistering, cracking or peeling | 300 h, no defects |
| Acid resistance (sulphuric acid) | 48 h, no defects | 48 h, no defects |
| Alkali resistance (sodium hydroxide) | 48 h, no defects | 48 h, no defects |
| Water resistance | 96 h, no defects | 96 h, no defects |
| Continuous condensation | 120 h, no defects | 120 h, no defects |
| Pull-off adhesion | ≥ 3 MPa | 7 MPa |
| Adhesion after 300 h salt spray | ≥ 3.5 MPa | 6 MPa |
| Artificial weathering, 300 h | ≤ grade 1 | Grade 0 |
National Building Materials Testing Center (CTC Group), report WT2020B01C04598 — system tested to HG/T 5176-2017 (alkali resistance assessed at corrosivity category C4). All assessed items passed.
Buying the coatings for your own crew or your customers?
No MOQ on standard products, 20 kg pails, ships 3–5 days after payment. We specify the system, calculate quantities and train your applicators by video.
Questions buyers ask
How much does metal roof restoration cost per m²?
The rust is really bad. Can it still be restored?
Do we have to sandblast or grind to bare metal?
What colours are available?
Can we combine rust restoration with a cool roof?
What are the application conditions?
Send roof photos — we'll tell you if it can be restored
Tell us what you need. Photos of the roof help us answer faster.
- Project enquirySend a few roof photos and the area. We'll tell you whether it can be restored, roughly what rust level it is, and whether any sheets need replacing.
- Product enquiryKnow the product? Ask for a price. Not sure? Tell us the use and the area and our engineers will specify it.
We reply by email within one working day.
