Cool roof coating · Factory and warehouse roofs

Metal-roof workshop at 40 °C?Measured 6–12 °C cooler inside on most projects

We coat the roof from the outside with a heat-reflective system that sends sunlight back before it heats the building. Once applied it uses no electricity, and the plant keeps running while we work.

  • Solar reflectance 0.86, emissivity 0.90 (third-party tested)
  • Applied from the outside of the roof — no shutdown
  • Cooling target written into the contract on projects we install
  • Buy the coatings with full technical support
6–12 °C
cooler indoor air (measured on most projects)
25 °C+
cooler roof surface (measured)
0
electricity used once applied
130,000 m²
of roof on two Huawei warehouses

Measured before work and after completion

Each pair is a thermometer-hygrometer reading inside the building, about 1.5 m above the floor: one before work and one after completion, on a day with similar weather.

  • Ludao Precision Machinery · Heshan, Jiangmen

    ↓8.0 °C workshop air

    40.8 °C 32.8 °C

    Ludao Precision Machinery · Heshan, Jiangmen

    8,500 m² · 4 days · 2019

    Roof surface 72.6 °C → 42.2 °C

  • Hunan Baoguang Auto Parts · Liuyang

    ↓11.3 °C workshop air

    44.9 °C 33.6 °C

    Hunan Baoguang Auto Parts · Liuyang

    9,000 m² · 7 days · 2026

    Roof surface 76.1 °C → 43.0 °C

  • DuPont (Zhangjiagang)

    ↓13.0 °C workshop air

    41.8 °C 28.8 °C

    DuPont (Zhangjiagang)

    8,600 m² · 8 days · 2025

    Roof surface 71.9 °C → 39.7 °C

    Air-conditioning on · sunny · 36 °C outside

  • Shaanxi Baoguang Auto Parts · Baoji

    ↓12.4 °C workshop air

    45.9 °C 33.5 °C

    Shaanxi Baoguang Auto Parts · Baoji

    9,000 m² · 7 days · 2026

    Roof surface 77.5 °C → 36.0 °C

  • Weilong Park Phase II (Huawei warehouse) · Changping, Dongguan

    ↓12.2 °C warehouse air

    39.8 °C 27.6 °C

    Weilong Park Phase II (Huawei warehouse) · Changping, Dongguan

    62,000 m² · 12 days · 2020

    Roof surface 74.6 °C → 44.5 °C

    Air-conditioning on · sunny · 36 °C outside

  • Goodman Boluo Logistics Park (Huawei warehouse) · Huizhou

    ↓7.5 °C warehouse air

    41.8 °C 34.3 °C

    Goodman Boluo Logistics Park (Huawei warehouse) · Huizhou

    68,000 m² · 15 days · 2021

    Roof surface 71.4 °C → 44.7 °C

  • Xiamen Faratronic

    ↓11.5 °C workshop air

    41.8 °C 30.3 °C

    Xiamen Faratronic

    47,800 m² · 15 days · 2022

    Roof surface 68.4 °C → 42.2 °C

    Air-conditioning on · sunny · 36 °C outside

  • Hilti (China) · Zhanjiang

    ↓9.6 °C workshop air

    41.4 °C 31.8 °C

    Hilti (China) · Zhanjiang

    16,000 m² · 7 days · 2023

    Roof surface 71.2 °C → 42.8 °C

  • Baoguang (Tianjin) Auto Parts

    ↓7.2 °C workshop air

    43.9 °C 36.7 °C

    Baoguang (Tianjin) Auto Parts

    24,000 m² · 14 days · 2026

    Roof surface 73.9 °C → 36.8 °C

Results differ from building to building — heat sources, ventilation and roof type all matter. Baoguang Tianjin has many heat-producing machines, so its drop is smaller. We measure your building before we specify.

How we measure

See all projects

Why fans and coolers can't hold back roof heat

Fans, evaporative coolers and air-conditioning deal with heat once it is inside. The coating stops it at the roof, before it gets in. On a summer afternoon a metal roof reaches 70–80 °C, and the air under it heats up from the top down.

  1. 1

    Sunlight is reflected back

    The 902 topcoat has a solar reflectance of 0.86 — most of the sunlight hitting the roof bounces off (CTC report WT2020B01C04600).

  2. 2

    Absorbed heat is released to the sky

    Hemispherical emissivity of 0.90: the heat the roof does absorb is radiated away as infrared, so the roof no longer bakes.

  3. 3

    Still works when dirty

    After soiling, reflectance changed by only 5% (the standard allows up to 20%). When dust builds up, rinsing with water restores it.

Already have fans, coolers or air-conditioning? Keep them. With the roof heat blocked, they run under less load.

Summer afternoon: metal roof surface measured at 79.9 °C (Zhongshan Hengrun Metal)
Summer afternoon: metal roof surface measured at 79.9 °C (Zhongshan Hengrun Metal)

Roof coating vs fans, coolers and air-conditioning

Cool roof coatingFans / evaporative coolers / air-conditioning
Where the heat is handledStopped outside, at the roofBlown around or cooled inside
Indoor air temperature6–12 °C lower on most measured projectsFans: little change. Evaporative coolers: a few degrees, with higher humidity. Air-conditioning: works, but costly to buy and run
ElectricityNone once appliedRuns — and bills — every day
InstallationOutside on the roof; production continuesWall openings, ducts or pipework

First, find out where the heat comes from

Workshop heat comes from the sun on the roof, from machines and from poor ventilation. We measure on site and specify for the building.

  • 01 Mostly sun on the roof Single-skin metal roofs, hottest at 2–3 pm, hotter the closer you get to the roof. Roof coating has the biggest effect.
  • 02 Lots of machine heat, poor ventilation Injection moulding machines, ovens: hot air collects at the top. Block the roof heat first, then add exhaust ventilation.
  • 03 Furnaces, or an insulated roof already A concentrated heat source, or a thick insulation layer under the roof. We measure the heat sources first, then choose the build-up.

The system

Two or three products, all water-based and made in our own factory, applied by spray, roller or brush.

  1. 01

    TYS-BIC560-901 primer

    Seals the substrate, bonds the topcoat and blocks near-infrared heat at the base of the system. 1–2 coats, 0.17–0.25 kg/m² per coat.

  2. 02

    TYS-TIC610 insulating mid-coat (optional)

    For low roofs over hot processes: thermal conductivity 0.14 W/(m·K), adhesion 1.7 MPa (CTC report WT2023B01C01585). Applied in 2–3 passes.

  3. 03

    TYS-BIC560-902 topcoat

    Reflects sunlight and radiates heat away. 1–2 coats, 0.17–0.25 kg/m² per coat, cross-applied. White as standard.

Buying the coatings for your own crew or your customers?

No MOQ on standard products, 20 kg pails, ships 3–5 days after payment. We specify the system, calculate quantities and train your applicators by video.

Third-party test data: 902 cool roof topcoat

Every coating looks reflective when it's new. Ask any supplier three things: a third-party report number, both solar reflectance and emissivity, and how much reflectance is lost after soiling.

PropertyStandard requirementTEYISHU 902
Change in solar reflectance after soiling≤ 20%5%
Dirt pick-up resistance (lower is better)Superior grade ≤ 15%9%
Solar reflectance≥ 0.800.86
Near-infrared reflectance≥ 0.800.85
Hemispherical emissivity≥ 0.850.90
Water resistance96 h, no defects96 h, no defects
Alkali resistance48 h, no defects48 h, no defects
Scrub resistance2,000 cycles, film intact2,000 cycles, film intact

National Building Materials Testing Center (CTC Group), report WT2020B01C04600 — tested to GB/T 25261-2018 (reflective flat topcoat) and GB/T 9755-2014 (superior grade). All items passed. Test sample: TYS-BIC560, white.

On projects we install, the result goes into the contract

For projects in China, and for projects abroad installed by our own crew (where project size justifies it and local rules allow).

  • Cooling target in the contract Two figures, agreed for your building and system: roof surface 20 °C or 25 °C cooler, and indoor air generally not less than 5 °C cooler.
  • Full refund if the target is missed After completion we re-measure at the same points on a day with similar weather. If the agreed target is not met, you get a full refund.
  • Final payment after re-measurement The final payment is due only when the re-measured readings meet the target.
  • No shutdown All work is done on the roof outside, area by area. Production carries on.
  • 5-year warranty in the contract We make the coating and apply it, so within the warranty any material or workmanship problem is ours to fix — materials and labour.
  • Buying coatings only? 5-year limited material warranty on complete TEYISHU systems, applied according to our instructions.

Questions buyers ask

How many degrees cooler will my building be?
On most completed projects indoor air dropped 6–12 °C: DuPont Zhangjiagang 13.0 °C, Shaanxi Baoguang 12.4 °C. Baoguang Tianjin, with many heat-producing machines, dropped 7.2 °C. Where machines produce a lot of heat, blocking the roof heat works best together with exhaust ventilation. On projects we install, the contract states two targets — roof surface 20 °C or 25 °C cooler, and indoor air generally not less than 5 °C cooler — agreed for your building.
Does the plant need to stop while you work?
No. All work is on the roof outside, area by area, and production carries on. Farms and other special sites get agreed working hours.
How long does it last? Does it still work when dirty?
Projects we install carry a 5-year warranty in the contract. After soiling, the 902 topcoat's reflectance changed by only 5% in third-party testing, so it keeps reflecting sunlight with dust on it; rinsing with water restores it when dust builds up.
Isn't radiative cooling or aerogel coating better?
Radiative cooling coatings are compared on the same two figures — solar reflectance and emissivity. Our 902 topcoat measures 0.86 and 0.90 (CTC report WT2020B01C04600). Aerogel works by low thermal conductivity and suits pipes and equipment insulation. On a metal-roof factory most heat comes from sun on the roof, so reflecting it back comes first; if you need more, add the TIC610 insulating mid-coat. Judge any coating by its test report and measured projects.
Can our own contractor apply it?
Yes. We specify the system, calculate quantities, send full application instructions and train your applicators by video. For larger projects our technician can come to check the roof, set the specification and supervise the first areas.
How is it priced?
Projects are priced by developed roof area. The price depends on roof type, standard or enhanced system, any rust or leak repairs, and the area and site conditions. Coatings are quoted per order; there is no MOQ on standard products, and paid samples are refunded on your first order.
What are the application conditions?
Apply at 5–35 °C and relative humidity up to 85%, with the surface at least 3 °C above the dew point and no hotter than 50 °C (avoid midday heat in summer). Do not apply in rain, fog or wind of force 5 or more, or on a wet surface; keep rain off for 4 hours after application (at 25 °C).

Send roof photos — we'll tell you what the roof needs

Tell us what you need. Photos of the roof help us answer faster.

  • Project enquirySend roof photos, the area, the location and how hot it gets inside. We'll tell you whether a cool roof suits the building and how we'd build it up.
  • Product enquiryKnow the product? Ask for a price. Not sure? Tell us the use and the area and our engineers will specify it.

We reply by email within one working day.

I need
Problem (tick all that apply)
Tap to choose photos, or drag them here

We use your details only to answer this enquiry.