Heat, rust and leaks in one job

Hot, rusty and leaking?Fixed in one mobilisation, by one team

One survey, one quote and one crew for rust treatment, leak sealing and a cool roof topcoat — all coatings from the same factory. Only perforated sheets are replaced. At Shaanxi Baoguang, workshop air dropped 12.4 °C after the partly rusted roof was restored.

  • Rust, leaks and heat in the right order
  • Perforated sheets replaced locally, not the whole roof
  • All layers from one factory — compatible
  • No shutdown
↓12.4 °C
workshop air, Shaanxi Baoguang (45.9 → 33.5 °C)
↓41.5 °C
roof surface, Shaanxi Baoguang (77.5 → 36.0 °C)
1 team
from survey to handover
Outside
roof work, area by area

Three contractors, three problems

Heat, rust and leaks have an order. Done separately, the jobs undo each other.

  • Cool roof first, leaks later Sealing joints means opening them up — the cool roof coat is damaged and has to be done again.
  • Topcoat without rust treatment Rust pushes up from under the paint; within a year or two it peels and rusts again.
  • Three makers' products Nobody is responsible for adhesion between layers. When it fails, three companies blame each other.
  • Three mobilisations Roof access, washing and crews happen three times. The total ends up higher.

The order of work: rust → leaks → cool roof

The cool roof topcoat works by reflecting sunlight, so it must be the outermost layer. Rust and waterproofing go underneath, and the topcoat protects them.

  1. 01

    One survey

    Rust levels, leak points and sheets to replace marked area by area; temperatures recorded before work.

  2. 02

    Wash and replace sheets

    Pressure-wash off loose rust, chalking and oil; rusted-through or deformed sheets replaced or patched.

  3. 03

    Rust layer

    By rust level — light: CST880-701 ×1–2; medium: RPP210 ×2; heavy: MAP120 ×1 + RPP210 ×2.

  4. 04

    Seal the joints

    Every screw sealed; laps, gutters, skylights and fan bases with AEW320 fabric-reinforced 3-coat seal.

  5. 05

    Cool roof layer

    901 primer and 902 topcoat, 1–2 coats each; TIC610 mid-coat added where more insulation is needed.

  6. 06

    Handover

    Coating and joints inspected, temperatures re-measured at the agreed points, water test or rain check, then the final payment.

Before and after: rust, leaks and heat in one job

  • Yuanda Metal (Shenzhen) – BeforeBefore Yuanda Metal (Shenzhen) – AfterAfter

    43.7 → 36.5 °C

    Yuanda Metal (Shenzhen)

    Rusted arched metal roof · 4,800 m² · 5 days

    Rust treatment, joint sealing and cool roof coats. Workshop air 43.7 °C → 36.5 °C; roof surface 72.6 °C → 46.1 °C.

  • Foshan Huahe Stainless Steel Pipe – BeforeBefore Foshan Huahe Stainless Steel Pipe – AfterAfter

    42.8 → 34.8 °C

    Foshan Huahe Stainless Steel Pipe

    Heavily rusted curved roof · 9,680 m² · 12 days

    RPP210 rust primer and 902 cool roof topcoat over the whole roof. Workshop air 42.8 °C → 34.8 °C; roof surface 74.3 °C → 38.3 °C.

Measured results on restored roofs

  • Shaanxi Baoguang Auto Parts · Baoji

    ↓12.4 °C workshop air

    45.9 °C 33.5 °C

    Shaanxi Baoguang Auto Parts · Baoji

    9,000 m² · 7 days · 2026

    Roof surface 77.5 °C → 36.0 °C

  • Baoguang (Tianjin) Auto Parts

    ↓7.2 °C workshop air

    43.9 °C 36.7 °C

    Baoguang (Tianjin) Auto Parts

    24,000 m² · 14 days · 2026

    Roof surface 73.9 °C → 36.8 °C

  • Foshan Huahe Stainless Steel Pipe

    ↓8.0 °C workshop air

    42.8 °C 34.8 °C

    Foshan Huahe Stainless Steel Pipe

    9,680 m² · 12 days · 2017

    Roof surface 74.3 °C → 38.3 °C

How we measure: indoor air at about 1.5 m above the floor, before work and after completion on a day with similar weather; roof surface with an infrared thermometer. Results differ from building to building — heat sources, ventilation and roof type all matter.

How we measure

See all projects

Priced item by item — on one quote

ItemWhat decides the cost
Washing and preparationRoof area, rust and dirt; one mobilisation means one wash
Sheet replacement and rust layerNumber of rusted-through or deformed sheets; rust level decides CST880-701, RPP210 or MAP120 + RPP210
Joint sealingNumber and length of screws, laps, gutters and skylights, listed separately
Cool roof layerRoof area and cooling target; standard system or with TIC610 mid-coat

Do you have to do all three? No. Areas that are rusty but not leaking skip the waterproofing; areas that only need rust protection skip the cool roof. The quote lists each area and step, so you can choose item by item.

On projects we install

For projects in China, and for projects abroad installed by our own crew (where project size justifies it and local rules allow).

  • One team, start to finish We make the coatings and our own crews apply all three layers — one company is responsible.
  • Survey first, then an itemised quote By area and by step: what is done, how many coats, what film thickness — written into the contract.
  • Final payment after acceptance Temperatures re-measured and joints water-tested or checked after rain before the final payment.
  • No shutdown Work from the outside of the roof, area by area.
  • One 5-year warranty Rust, leaks and heat covered in the same contract.
  • What you receive Survey record, itemised quote, application log with film thickness, same-angle before-and-after photos and temperature comparison, warranty certificate.

Questions buyers ask

How much cooler will the workshop be after restoration?
At Shaanxi Baoguang, where the partly rusted roof got rust treatment and cool roof coats in one job, workshop air went from 45.9 °C to 33.5 °C. We measure on site during the survey; on projects we install the cooling target goes into the contract.
Is doing it all at once cheaper than separately?
Yes. Washing, roof access and mobilisation happen once, and later steps don't damage earlier coats.
Can production carry on?
Yes. All work is on the roof outside, area by area.
The rust is very bad. Can it still be done?
Yes, unless the sheets are rusted through over large areas. Perforated sheets are replaced or patched first. If perforation is widespread or purlins are corroded, re-roofing is better value and we'll tell you.
Can we buy the full set of coatings for our own contractor?
Yes. We specify the complete system — rust layer, joint sealing and cool roof coats — calculate quantities and train your applicators by video. No MOQ on standard products.

Send roof photos — heat, rust and leaks assessed together

Tell us what you need. Photos of the roof help us answer faster.

  • Project enquirySend a few roof photos and the area. We'll tell you which of the three the roof needs, which it doesn't, and how we'd do it.
  • Product enquiryKnow the product? Ask for a price. Not sure? Tell us the use and the area and our engineers will specify it.

We reply by email within one working day.

I need
Problem (tick all that apply)
Tap to choose photos, or drag them here

We use your details only to answer this enquiry.