Projects

Named projects, measured results

1,000+ projects and 10 million m²+ of roofs in over 20 provinces of China, applied by our own crews with our own coatings. Below is a selection — each with the client, the roof, the system and, for cooling projects, the temperatures before and after.

1,000+
projects completed
20+
provinces in China
11 years
in factory roof coatings
10 million m²+
of roofs coated

Cool roof projects: measured before and after

System: 901 primer + 902 topcoat, applied from the outside of the roof, unless stated otherwise.

  • Weilong Park Phase II (Huawei warehouse)Logistics

    Weilong Park Phase II (Huawei warehouse)

    Changping, Dongguan · 62,000 m² · 12 days · 2020

    Warehouse air 39.8 °C 27.6 °C ↓12.2 °C

    Roof surface 74.6 °C → 44.5 °C

    Air-conditioning on · sunny · 36 °C outside

    Sandwich-panel metal roof over a closed, air-conditioned warehouse.

  • Goodman Boluo Logistics Park (Huawei warehouse)Logistics

    Goodman Boluo Logistics Park (Huawei warehouse)

    Boluo, Huizhou · 68,000 m² · 15 days · 2021

    Warehouse air 41.8 °C 34.3 °C ↓7.5 °C

    Roof surface 71.4 °C → 44.7 °C

    Sandwich-panel metal roof over a closed, unventilated warehouse.

  • Xiamen FaratronicElectronics

    Xiamen Faratronic

    Xiamen · 47,800 m² · 15 days · 2022

    Workshop air 41.8 °C 30.3 °C ↓11.5 °C

    Roof surface 68.4 °C → 42.2 °C

    Air-conditioning on · sunny · 36 °C outside

    Rusted joints and flaking old coating treated first, then 901 + 902.

  • DuPont (Zhangjiagang)Chemicals

    DuPont (Zhangjiagang)

    Zhangjiagang, Jiangsu · 8,600 m² · 8 days · 2025

    Workshop air 41.8 °C 28.8 °C ↓13.0 °C

    Roof surface 71.9 °C → 39.7 °C

    Air-conditioning on · sunny · 36 °C outside

    Sandwich-panel metal roof over a closed, air-conditioned workshop.

  • Hilti (China)Tools

    Hilti (China)

    Zhanjiang, Guangdong · 16,000 m² · 7 days · 2023

    Workshop air 41.4 °C 31.8 °C ↓9.6 °C

    Roof surface 71.2 °C → 42.8 °C

    Sandwich-panel metal roof over a closed workshop.

  • Shaanxi Baoguang Auto PartsAuto parts

    Shaanxi Baoguang Auto Parts

    Baoji, Shaanxi · 9,000 m² · 7 days · 2026

    Workshop air 45.9 °C 33.5 °C ↓12.4 °C

    Roof surface 77.5 °C → 36.0 °C

    Partly rusted roof: RPP210 rust primer ×2, then 901 + 902. Heat-producing equipment inside.

  • Hunan Baoguang Auto PartsAuto parts

    Hunan Baoguang Auto Parts

    Liuyang, Hunan · 9,000 m² · 7 days · 2026

    Workshop air 44.9 °C 33.6 °C ↓11.3 °C

    Roof surface 76.1 °C → 43.0 °C

    Sandwich-panel metal roof; heat-producing equipment inside.

  • Baoguang (Tianjin) Auto PartsAuto parts

    Baoguang (Tianjin) Auto Parts

    Wuqing, Tianjin · 24,000 m² · 14 days · 2026

    Workshop air 43.9 °C 36.7 °C ↓7.2 °C

    Roof surface 73.9 °C → 36.8 °C

    Partly rusted roof: RPP210 ×2, then 901 + 902. Many heat sources inside, so a smaller drop.

  • Jiangsu Dongze Environmental TechnologyEquipment

    Jiangsu Dongze Environmental Technology

    Yixing, Jiangsu · 9,890 m² · 10 days · 2026

    Workshop air 43.8 °C 35.3 °C ↓8.5 °C

    Roof surface 75.8 °C → 37.9 °C

    Sandwich-panel metal roof over a closed workshop.

  • Euroklimat Air-ConditioningHVAC equipment

    Euroklimat Air-Conditioning

    Tangxia, Dongguan · 42,000 m² · 28 days · 2020

    Workshop air 42.6 °C 31.2 °C ↓11.4 °C

    Roof surface 70.8 °C → 40.3 °C

    Roof washed, laps reinforced with waterproofing coating, then 901 + 902.

  • Tokheim Hengshan TechnologyFuel dispensers

    Tokheim Hengshan Technology

    Huangpu, Guangzhou · 7,800 m² · 6 days · 2019

    Workshop air 43.8 °C 34.5 °C ↓9.3 °C

    Roof surface 75.4 °C → 40.9 °C

    Single-skin roof and metal gable walls; walls coated from a lift.

  • Ludao Precision MachineryPrecision machinery

    Ludao Precision Machinery

    Heshan, Jiangmen · 8,500 m² · 4 days · 2019

    Workshop air 40.8 °C 32.8 °C ↓8.0 °C

    Roof surface 72.6 °C → 42.2 °C

    Single-skin metal roof over a poorly ventilated workshop.

  • JPCI ThermostatThermostats

    JPCI Thermostat

    Foshan · 8,200 m² · 8 days · 2023

    Workshop air 42.9 °C 34.6 °C ↓8.3 °C

    Roof surface 74.3 °C → 45.9 °C

    Dark metal roof; production lines kept running.

  • Foshan Huahe Stainless Steel PipeSteel pipe

    Foshan Huahe Stainless Steel Pipe

    Foshan · 9,680 m² · 12 days · 2017

    Workshop air 42.8 °C 34.8 °C ↓8.0 °C

    Roof surface 74.3 °C → 38.3 °C

    Rusted curved roof: RPP210 ×1, then 902 ×2.

  • Yuanda Metal (Shenzhen)Metal products

    Yuanda Metal (Shenzhen)

    Shenzhen · 4,800 m² · 5 days · 2021

    Workshop air 43.7 °C 36.5 °C ↓7.2 °C

    Roof surface 72.6 °C → 46.1 °C

    Rusted arched roof with no ventilation inside: RPP210 ×2, then 902 ×2.

  • Guangzhou Lishi CosmeticsCosmetics

    Guangzhou Lishi Cosmetics

    Huadu, Guangzhou · 6,800 m² · 5 days · 2021

    Workshop air 42.4 °C 36.6 °C ↓5.8 °C

    Roof surface 74.3 °C → 42.6 °C

    Measured by the client (video)

    Grey synthetic resin roof tiles: cleaned, then 902 cool roof topcoat. Heat only — no rust treatment needed.

How we measure: indoor air at about 1.5 m above the floor, before work and after completion on a day with similar weather; roof surface with an infrared thermometer. Results differ from building to building — heat sources, ventilation and roof type all matter.

How we measure

Rust restoration: whole roofs, no re-roofing

  • Manufacturing plant · HuangshiRust restoration

    Manufacturing plant · Huangshi

    Huangshi, Hubei · 34,800 m² · 23 days · 2024

    Several buildings recoated, no sheets replaced

    Washed, rust primer, then bright blue anti-corrosion topcoat, building by building.

  • Shiji Xingui CeramicsRust restoration

    Shiji Xingui Ceramics

    Yichun, Jiangxi · 52,000 m² · 27 days · 2022

    Whole roof recoated, factory kept running

    Washed, rust converter primer, then dark blue-grey topcoat, area by area.

  • MODENA Ceramic MachineryRust restoration

    MODENA Ceramic Machinery

    Jiangmen · 46,200 m² · 26 days · 2022

    Several large-span buildings recoated

    Blackened, rusted roofs: rust converter primer, then blue topcoat.

  • Xiduan Machine ToolsRust restoration

    Xiduan Machine Tools

    Wuxi · 12,000 m² · 9 days · 2020

    Perforations patched, no re-roofing

    Rust converted, perforations patched, then grey primer and a white topcoat — rust protection and cooling together.

  • Zhongshang Guotong warehouseRust + leaks

    Zhongshang Guotong warehouse

    Foshan · 6,720 m² · 8 days · 2020

    Restored instead of the planned re-roof

    Leaking joints sealed with AEW320, then rust converter primer and CST880 topcoat.

  • Fuyuan Carton / Fushan Foam PackagingRust + leaks

    Fuyuan Carton / Fushan Foam Packaging

    Zhongshan · 16,800 m² · 12 days

    Every screw point sealed

    Rusted screws sealed one by one with waterproofing coating, then the roofs recoated.

Leak repair and walls

  • TOYO Rubber & PlasticsLeak repair

    TOYO Rubber & Plastics

    Zengcheng, Guangzhou · 13,200 m² · 21 days · 2023

    Joint-by-joint repair, then full recoat

    Ventilator bases, skylight edges and laps repaired, then the whole roof coated blue.

  • Hubei SibaoRust + leaks

    Hubei Sibao

    Xiantao, Hubei · 8,240 m² · 11 days · 2020

    Fan bases, gutters and parapets sealed

    Rust converter over the roof; fan bases, gutters and parapet joints fabric-reinforced; then topcoat.

  • Multi-storey factory · LonggangConcrete roof

    Multi-storey factory · Longgang

    Shenzhen · 9,200 m² · 16 days · 2023

    New continuous waterproof layer

    Equipment bases treated, then a continuous waterproof coating over the flat roof.

  • Jintian EnterpriseWalls + interior

    Jintian Enterprise

    Qingyuan · 5,680 m² · 7 days · 2021

    Wall cladding, roof underside and steelwork

    Rusted wall cladding recoated red and grey from a lift; roof underside, beams and columns coated inside; joints fabric-reinforced.

Planning a similar project?

Send roof photos, the area and the location. We'll tell you how we'd do it — whether you need the whole job done or the coatings for your own team.

Need the roof done, or need the coatings?

Tell us what you need. Photos of the roof help us answer faster.

  • Project enquirySend roof photos, the area and what's wrong — heat, rust or leaks. We'll tell you how we'd fix it and quote item by item.
  • Product enquiryKnow the product? Ask for a price. Not sure? Tell us the use and the area and our engineers will specify it.

We reply by email within one working day.

I need
Problem (tick all that apply)
Tap to choose photos, or drag them here

We use your details only to answer this enquiry.