Cool roof coatings
↓6–12 °Cindoor air (measured on most projects)
- For: metal and concrete roofs
- Standard system: 901 primer + 902 topcoat
- Over hot processes: add TIC610 mid-coat
For coating manufacturers, brands, distributors and roofing contractors
TEYISHU develops and makes heat-reflective, anti-rust and waterproofing coatings — and has proven them with its own crews on 10 million m²+ of factory and warehouse roofs in China. Work with us as a supplier of finished coatings, as an OEM/ODM partner, or as a source of core materials for local production.
Own factory and R&DOwn application crewsWe reply within one working day

















Complete, ready-to-use systems under the TEYISHU brand. For importers, distributors and roofing contractors who want a proven product to sell or apply.
Our systems under your brand — or developed for your roofs, your climate and your local standards. For coating brands and distributors building their own range.
We supply the core materials as prepared components. You blend, fill and sell in your own plant, with our production guidance. For coating manufacturers who want to produce close to their market.
Whichever way you choose
A coating is easy to copy on paper and hard to prove on a roof. What we bring is the part that takes years: formulations that have already been through real factory roofs, and the data to show it.
Every system was used on our own projects before we offered it to anyone else — metal and concrete roofs, light and heavy rust, air-conditioned warehouses and hot workshops.
Third-party test reports, named projects with before-and-after temperature readings, and a written measuring method that can be repeated on any roof.
System selection, quantities, application instructions and video training for applicators; production guidance for partners who blend locally.
What we supply, what you produce or apply, and who is responsible for what are set out before the first order.

↓6–12 °Cindoor air (measured on most projects)
No grindingapply over rust after removing loose scale
No sheets removedAEW320 elongation at break 527% (third-party tested)
Tell us the intended use, the surface (metal sheet, concrete or steel) and the area. Our engineers will specify the system and quantities.
Warehouse roof cooling · 62,000 m² · 12 days
Warehouse air
Before39.8 °CAfter27.6 °C
Air-conditioning on · sunny · 36 °C outside
Roof surface 74.6 °C → 44.5 °C
Sandwich-panel metal roof over a closed, air-conditioned warehouse. System: 901 primer + 902 topcoat, applied from the outside of the roof while the warehouse kept running.
Workshop roof cooling · 8,500 m² · 4 daysLudao Precision Machinery · Heshan, JiangmenWorkshop air 40.8 °C → 32.8 °CSingle-skin metal roof over a poorly ventilated workshop.
Metal wall restorationJintian Enterprise · QingyuanMetal wall restorationRusted wall cladding and roof fasteners. Joints treated and sealed first, then the whole facade recoated in red and grey.
Metal roof repairTOYO Rubber & Plastics · GuangzhouMetal roof repairA roof crowded with ventilators and skylights. Ventilator bases, skylight edges and laps repaired first, then a full topcoat.
Ludao Precision Machinery · Heshan, JiangmenWorkshop air 40.8 °C → 32.8 °C
Jintian Enterprise · QingyuanMetal wall restoration
TOYO Rubber & Plastics · GuangzhouMetal roof repairHow we measure: indoor air at about 1.5 m above the floor, before work and after completion, in similar weather; roof surface with an infrared thermometer.
Our coatings come from our own factory in Foshan, and in China our own crews apply them — no subcontracting. On projects we install, the cooling target goes into the contract and the final payment is due only after re-measurement. Every problem found on a roof goes back into the formulation.
Batch, number of coats and consumption are recorded for every roof area, so any question can be traced to the batch and the crew.
Own factory · 10 in-house application crews
On projects we install, we measure at fixed points before work and re-measure at the same points after. The final payment is due only when the target is met.
Ludao Precision Machinery: workshop air 40.8 °C → 32.8 °C
Each step lists the material, number of coats and dry film thickness, and is checked at handover.
Dry film thickness measured on site
Who you sell to, the roofs in your region, and whether you want finished coatings, your own brand or local production. We reply within one working day.
We send data sheets, test reports and samples. Test them in your lab or on a roof, and measure before and after with our method.
We settle the way of working, the technical support and the responsibilities on each side, then start with a first order.
Factory roof, before coating
Summer roof: 79.9 °C measured
Finished cool roofOur 901 primer and 902 topcoat reflect sunlight off the roof before it heats the building. On most projects indoor air drops 6–12 °C — with no extra electricity. For low roofs over hot processes, we add a TIC610 insulating mid-coat.
Cool roof coating
Rusted factory roof
Rust-through around screws
Rust at skylights and lapsWe treat by rust level. After loose rust is removed, our patented primer converts the remaining rust into a stable protective layer — no sandblasting. Only perforated sheets are replaced, so most roofs don't need re-roofing.
Rust restoration
Old metal roof
Rusted, leaking screw holes
Skylight and lap repairsWe find each leak first, then seal screws, laps and gutters with a fabric-reinforced 3-coat seal. If leaks are widespread, we waterproof the whole roof. No sheets removed.
Leak repair
Whole factory roof
Rusted walls and eaves
Rust, leak and heat work in one goRust treatment, leak sealing and a cool roof topcoat — one survey, one mobilisation, one team.
Complete restorationRunning a factory or warehouse outside China?
Buy the coatings with technical support for your local contractor. For larger projects our technician can check the roof, set the specification and supervise the first areas; where project size justifies it and local rules allow, we send our own crew.
Manufacturers, brands and distributors: tell us your market and how you would like to work with us. Factory owners: photos of the roof help us answer faster.