About TEYISHU

We make the coating and apply it ourselves

Hot workshops, rusty roofs, leaks: we solve them with coatings from our own factory and our own application crews. On projects we install, the cooling target and the 5-year warranty go into the contract.

11 years
in factory roof coatings
1,000+
projects completed
20+
provinces with projects
10 million m²+
of roofs coated

Who we are

One company from formula to finished roof

TEYISHU® was founded in 2015 in Gaoming, Foshan. Our factory makes heat-reflective, anti-rust and waterproofing coatings, and our 10 in-house crews apply them on factory and warehouse roofs: cool roofs, rust restoration and leak repair.

Buying only the coatings? Our engineers specify the system, calculate quantities and guide your applicators. Want the job done? We take it from survey and quote to application and handover.

Building your own range? We also supply under your brand (OEM/ODM from 5 tonnes) and provide core materials for local production. See the three ways to work with us.

Formula, production and application in one company

The coating comes from our own factory, the work is done by our own crews, and one company answers for the result.

  • Our own production Our own production Three product lines made in our Gaoming factory. Every batch is tested before dispatch and a sample retained; key products have third-party test reports.
  • Our own crews Our own crews 10 in-house crews, 40+ skilled applicators and 5 technical service engineers. The number of coats and the film thickness are recorded in the application log.
  • Measured results Measured results Shaanxi Baoguang: workshop air 45.9 °C → 33.5 °C, measured before work and after completion.
  • Certified Certified ISO 9001 / 14001 / 45001, patented rust converter, AAA credit rating; Grade II specialist contractor licence held by our parent company.

Factory and capacity

3,000 m²+
factory floor area
1,500 t+
monthly capacity
100%
of batches tested before dispatch, samples retained
ISO 9001
quality management certified

From the job site back to the lab

Every coating is used on roofs coated by our own crews, then improved using what we measure and find there.

  1. 01

    Site problems

    Heat, rust and leaks on metal sheet, concrete and steelwork.

  2. 02

    Product development

    Formula and system layers designed for the substrate and the problem.

  3. 03

    Tested on our own projects

    Temperatures, film thickness and joints checked on jobs we carry out.

  4. 04

    Site feedback

    Problems during and after application recorded one by one.

  5. 05

    Improvement

    Formula, layers and steps adjusted — then back to the site.

Our lab and production

  • Salt-spray test chamber
    Salt-spray test chamber
  • UV ageing tester
    UV ageing tester
  • Scrub resistance tester
    Scrub resistance tester
  • Grinding mill — fineness control
    Grinding mill — fineness control
  • Automatic filling line, 20 kg pails
    Automatic filling line, 20 kg pails
  • R&D and testing
    R&D and testing
  • Quality control
    Quality control
  • Ready for dispatch
    Ready for dispatch

Our history

11 years, 1,000+ projects

  1. 2015

    Founded in Foshan

    Factory and office set up in Gaoming, Foshan; production of roof coatings begins.

  2. 2017

    Own coatings, own crews

    Rust and heat projects such as Foshan Huahe Stainless Steel Pipe, with our own coatings and crews.

  3. 2019

    Rust converter patent filed

    Water-based rust converter patent (ZL201910886793.4). Ludao: 8,500 m² roof in 4 days, workshop air 8.0 °C cooler.

  4. 2020

    Third-party testing, large warehouses

    Coatings tested at the National Building Materials Testing Center. Weilong Phase II: 62,000 m² warehouse roof in 12 days.

  5. 2021–2023

    Full product range

    Waterproofing coating and insulating mid-coat test reports; heat, rust and leak lines complete.

  6. 2026

    AAA credit, 1,000+ projects

    AAA enterprise credit rating in September; 1,000+ projects and 10 million m²+ of roofs in over 20 provinces.

Certificates

Foshan Teyoushu New Material Co., Ltd. develops, makes and sells the coatings. The Grade II specialist contractor licence for waterproofing, anti-corrosion and insulation works is held by our 100% shareholder, Guangdong Teyishu New Material Co., Ltd.

  • Grade II specialist contractor licence (waterproofing, anti-corrosion, insulation)
    Grade II specialist contractor licence (waterproofing, anti-corrosion, insulation)No. D344668835 · Guangdong Teyishu New Material Co., Ltd. · valid to 29 June 2028
  • ISO 9001 quality management
    ISO 9001 quality managementNo. 21425Q0124R0S · valid to 5 May 2028
  • ISO 14001 environmental management
    ISO 14001 environmental managementNo. 21425E0060R0S · valid to 5 May 2028
  • ISO 45001 occupational health and safety
    ISO 45001 occupational health and safetyNo. 21425S0046R0S · valid to 5 May 2028
  • Invention patent: water-based rust-converting anti-corrosion coating
    Invention patent: water-based rust-converting anti-corrosion coatingNo. ZL201910886793.4 · granted 11 June 2021
  • TEYISHU registered trademark
    TEYISHU registered trademarkClass 2 No. 20612789 · Class 35 No. 20612890

Third-party test reports

Tested by the National Building Materials Testing Center (CTC Group). Report numbers can be verified; ask us for copies.

ProductReport no.Key results
902 cool roof topcoat (sample TYS-BIC560)WT2020B01C04600Solar reflectance 0.86, near-IR 0.85, emissivity 0.90; reflectance change after soiling 5% (standard allows 20%); dirt pick-up 9%, superior grade
TIC610 insulating mid-coatWT2023B01C01585Bond 1.7 MPa (≥ 0.4 required); thermal conductivity 0.14 W/(m·K); water and alkali, no defects
CST880 anti-corrosion system (primer + topcoat)WT2020B01C04598Salt spray 300 h, acid 48 h, alkali 48 h, water 96 h, condensation 120 h — no defects; ageing 300 h grade 0; adhesion 7 MPa, 6 MPa after salt spray
AEW320 roof waterproofing coatingWT2021B01C03937Elongation 527%; 276% after heat ageing, 584% / 581% after acid / alkali; watertight at 0.3 MPa; no cracks at −10 °C
MAP120 rust converter primerWT2020B01C04599Humidity 120 h, water and salt water 48 h, no defects; 96 h salt spray rust grade 0; impact 50 cm

Want to see the factory or a finished roof?

Tell us where you are and what you're planning. We can arrange a factory visit or share project records for a similar roof.

Need the roof done, or need the coatings?

Tell us what you need. Photos of the roof help us answer faster.

  • Project enquirySend roof photos, the area and what's wrong — heat, rust or leaks. We'll tell you how we'd fix it and quote item by item.
  • Product enquiryKnow the product? Ask for a price. Not sure? Tell us the use and the area and our engineers will specify it.

We reply by email within one working day.

I need
Problem (tick all that apply)
Tap to choose photos, or drag them here

We use your details only to answer this enquiry.