Coated over the rust in 2019. Still intact in year 6.16,800 m² of old metal roofs, rust converter system
Fuyuan Carton / Fushan Foam Packaging runs a packaging plant in Zhongshan with several buildings under old metal roofs. The whole roof surface was rusted, worst along the ridges and laps, and the rusted screw points needed sealing against leaks. In 2019 we sealed the screw points, sprayed rust converter primer straight over the rust, then an iron-red topcoat. In July 2025 we flew a drone over the same roofs.
- 16,800 m²
- roof area
- 12 days
- to complete
- 2019
- coated
- Year 6
- revisit: coating intact
The same roof, 2019 to 2025
All photos show the same roof: the same ridge and the same row of turbine ventilators. The photos are not retouched.
-
Before
After
Sep 2019
Rust converted in place
Before work → rust converter primer applied
After pressure washing, the primer was sprayed over the remaining rust. The rust turns black as it is converted.
-
Before
After
Year 6
Drone revisit, July 2025
Primer stage, Sep 2019 → revisit, 7 Jul 2025
Iron-red topcoat intact, colour even. No returning rust or peeling seen in the drone photos.
After the revisit, the client asked us to restore the roofs on site that had not been done before.
What we did
Several buildings under old metal roofs, rusted over the whole surface, worst at ridges, laps and screws.
- 1
Screw points first
Every rusted screw and hole was dabbed with waterproofing coating before the roof was coated.
- 2
Straight over the rust
After pressure washing, rust converter primer was sprayed straight onto the remaining rust. No sandblasting.
- 3
Iron-red topcoat
The whole roof was then sprayed with an iron-red anti-corrosion topcoat.
- 4
12 days, our own crew
16,800 m² across several buildings, applied by our own crew.

For contractors and distributors
This rust converter system is what we supply for export, with the technical data sheet, test reports and method statement. For heavily rusted roofs our current specification is MAP120 ×1 → RPP210 ×2 → CST880 ×1–2; the full system is tested to 300 h neutral salt spray and 7 MPa adhesion. Start with a sample kit on a rusty roof of your own.
Need the roof done, or need the coatings?
Tell us what you need. Photos of the roof help us answer faster.
- Project enquirySend roof photos, the area and what's wrong — heat, rust or leaks. We'll tell you how we'd fix it and quote item by item.
- Product enquiryKnow the product? Ask for a price. Not sure? Tell us the use and the area and our engineers will specify it.
We reply by email within one working day.